Material Test Reports (MTR) from Chinese Steel Mills: How to Check the Mill, the Heat Number and the Holder
By The team behind ChineseCheck · updated 2026-11-15 · 8 min read
A material test report — mill test certificate, MTC, MTR — is the document that ties a batch of steel to its chemistry and mechanical properties. Chinese mills issue them for every heat; traders forward them with every quotation. Because they are routine, they are also the document most often altered, reused or simply mismatched to the goods. This guide reads an MTR field by field and shows how to check the parts that can be checked.
Read the certificate type first
Under EN 10204, a 2.1 or 2.2 document is the manufacturer's own declaration; a 3.1 certificate is validated by the manufacturer's independent inspection department; a 3.2 certificate is countersigned by an independent inspector or the purchaser's representative. The type should match your purchase order. A supplier who promised 3.1 and delivers a 2.2 "quality certificate" has not delivered.
The fields that matter
- Issuing mill. The registered name and address of the mill — not the trader. The chemistry and mechanicals were measured here. Compare the mill's name with the heat-number format the mill uses; large mills print the heat number in a recognisable pattern.
- Heat (cast) number and batch. The link between the paper and the steel. The same heat number must be stencilled or tagged on the product. A report with no heat number, or a heat number that does not appear on the material, certifies nothing you hold.
- Standard and grade. EN 10025 S355J2, ASTM A36, GB/T 1591 Q355B … The grade determines the limits the test results are measured against.
- Chemistry. C, Si, Mn, P, S and the alloying elements, each within the grade's limits. Values exactly at the limit, or copied identically across many heats, are a classic sign of an edited report.
- Mechanical properties. Yield, tensile, elongation, impact at the specified temperature. Compare with the grade; compare across heats — real results vary.
- Third-party witness or inspection stamp. On 3.2 documents: the inspector's organisation, stamp and signature. On any document: the mill's inspection department stamp.
- Report number, date and signatory. The references the mill or laboratory uses to confirm the document.
What is most often wrong
- Trader's name instead of the mill. The "manufacturer" field names the trading company you are talking to. Ask for the mill's own certificate and the purchase record from the mill.
- Reused report. A genuine report for another buyer's heat, forwarded with a new quotation. The heat number on the paper does not match the material.
- Edited values. Chemistry or mechanicals changed to meet your grade. Identical values across heats, limits met exactly, or inconsistent fonts in a PDF.
- Fictional laboratory. A third-party test report from a laboratory that cannot be found in any accreditation register.
How to check each part
The mill. Confirm the mill is a registered company (name, USCC, status), that it actually produces the grade and form you ordered, and that it is the entity named on the report — not a related trading company. A registry lookup on the USCC settles the first two; the third is the holder-vs-supplier question every certificate raises.
The report. Mills confirm their own certificates through their quality departments; for reports issued by a laboratory, the laboratory confirms the report number. CMA-marked Chinese reports can also be looked up in the CNCA report-number system by report number, laboratory, signatory and client. If SGS, BV or Intertek witnessed the test, their desks confirm the complete document — SGS, for example, never from a number alone.
The laboratory. CNAS lists accredited laboratories and their scopes; CPSC lists labs accepted for consumer-product rules. Accreditation confirms the lab exists and is competent for a scope. It does not confirm that this report came from that lab — the lab does.
The material. Nothing on paper replaces matching the heat number on the steel to the heat number on the report, and, for critical applications, an independent re-test of a sample.
The one question the paperwork cannot answer
Even a genuine 3.1 certificate from a real mill leaves one gap: is the company you are paying the mill, an authorised trader of that mill, or a third party who obtained the paper? That is a comparison between the report's issuer, the registered company on your contract and the registered company on the bank details — and it is the comparison our checks make. Upload the MTR, type the supplier's name or USCC, and the holder, the laboratory and the dates are compared, with the official paths for the Chinese registries handled by our team.